Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 23 results ...

Abd Elsalam, M F (2021) Breaking through the classical determinants in the field of hyper urban planning. Construction Innovation, 21(4), 818-36.

Al Jassmi, H, Al Ahmad, M and Ahmed, S (2021) Automatic recognition of labor activity: a machine learning approach to capture activity physiological patterns using wearable sensors. Construction Innovation, 21(4), 555-75.

Alkhateeb, A M, Hyari, K H and Hiyassat, M A (2021) Analyzing bidding competitiveness and success rate of contractors competing for public construction projects. Construction Innovation, 21(4), 576-91.

Arai, K and Morimoto, E (2021) Productivity and innovation in the Japanese construction industry. Construction Innovation, 21(4), 917-33.

Bilge, E C and Yaman, H (2021) Information management roles in real estate development lifecycle: literature review on BIM and IPD framework. Construction Innovation, 21(4), 723-42.

Bosch-Sijtsema, P, Claeson-Jonsson, C, Johansson, M and Roupe, M (2021) The hype factor of digital technologies in AEC. Construction Innovation, 21(4), 899-916.

Charlson, J and Dimka, N (2021) Design, manufacture and construct procurement model for volumetric offsite manufacturing in the UK housing sector. Construction Innovation, 21(4), 800-17.

Dharmapalan, V, O'Brien, W J, Morrice, D and Jung, M (2021) Assessment of visibility in industrial construction projects: a viewpoint from supply chain stakeholders. Construction Innovation, 21(4), 782-99.

Ghansah, F A, Owusu-Manu, D G, Ayarkwa, J, Edwards, D J and Hosseini, M R (2021) Exploration of latent barriers inhibiting project management processes in adopting smart building technologies (SBTs) in the developing countries. Construction Innovation, 21(4), 685-707.

  • Type: Journal Article
  • Keywords: construction technology; developing countries; Ghana; innovation; project management processes; smart building technologies
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/CI-07-2020-0116
  • Abstract:
    While smart building technologies (SBTs) implementation ensures sustainability, their adoption is hampered by latent barriers, especially in project management processes. These latent barriers must be addressed to facilitate the successful and widespread adoption of SBTs. Therefore, this study aims to explore the significant latent barriers inhibiting the project management processes in adopting SBTs in developing countries. A positivist research philosophy couched within a deductive approach was adopted to undertake a quantitative questionnaire survey of 227 project management and design team participants. Descriptive and inferential analytical tools (including a one sample T-test and exploratory factor analysis) were then adopted to interpret data collected. The results reveal that the "high cost of smart sustainable materials and equipment" is the major significant barrier hindering the adoption of SBTs in developing countries. Latent barriers were: "structure and time-related barriers", "construction-related barriers" and "human, policy and cost-related barriers". The study contributes novel insights into the prevailing nascent discourse on SBTs from the perspectives of construction project managers and design teams in developing countries, particularly. Furthermore, to the best of the authors' knowledge, this is the first study that ascertains the significant barriers inhibiting project management processes in adopting SBTs in developing countries.

Gharouni Jafari, K, Noorzai, E and Hosseini, M R (2021) Assessing the capabilities of computing features in addressing the most common issues in the AEC industry. Construction Innovation, 21(4), 875-98.

Guven, G and Ergen, E (2021) Tracking major resources for automated progress monitoring of construction activities: masonry work case. Construction Innovation, 21(4), 648-67.

Kapogiannis, G, Fernando, T and Alkhard, A M (2021) Impact of proactive behaviour antecedents on construction project managers' performance. Construction Innovation, 21(4), 708-22.

Kasbar, M, Staub-French, S, Pilon, A, Poirier, E, Teshnizi, Z and Froese, T (2021) Construction productivity assessment on Brock Commons Tallwood House. Construction Innovation, 21(4), 951-68.

Lavikka, R, Chauhan, K, Peltokorpi, A and Seppänen, O (2021) Value creation and capture in systemic innovation implementation: case of mechanical, electrical and plumbing prefabrication in the Finnish construction sector. Construction Innovation, 21(4), 837-56.

M.E. Sepasgozar, S, Shirowzhan, S and Loosemore, M (2021) Information asymmetries between vendors and customers in the advanced construction technology diffusion process. Construction Innovation, 21(4), 857-74.

Obi, L I, Arif, M, Awuzie, B, Islam, R, Gupta, A D and Walton, R (2021) Critical success factors for cost management in public-housing projects. Construction Innovation, 21(4), 625-47.

Ofori-Kuragu, J K and Osei-Kyei, R (2021) Mainstreaming pre-manufactured offsite processes in construction – are we nearly there?. Construction Innovation, 21(4), 743-60.

Pablo, Z, London, K, Wong, P S P and Khalfan, M (2021) Actor-network theory and the evolution of complex adaptive supply networks. Construction Innovation, 21(4), 668-84.

Salama, T, Salah, A and Moselhi, O (2021) Integrating critical chain project management with last planner system for linear scheduling of modular construction. Construction Innovation, 21(4), 525-54.

Sarvari, H, Nassereddine, H, Chan, D W M, Amirkhani, M and Md Noor, N (2021) Determining and assessing the significant barriers of transferring unfinished construction projects from the public sector to the private sector in Iran. Construction Innovation, 21(4), 592-607.

Sergeeva, N and Duryan, M (2021) Reflecting on knowledge management as an enabler of innovation in project-based construction firms. Construction Innovation, 21(4), 934-50.

Sutrisna, M, Tjia, D and Wu, P (2021) Developing a predictive model of construction industry-university research collaboration. Construction Innovation, 21(4), 761-81.

Ying, F J, O'Sullivan, M and Adan, I (2021) Simulation of vehicle movements for planning construction logistics centres. Construction Innovation, 21(4), 608-24.